The 30-Day Sprint
Design catalogue

Every visual decision, in one place

Seeded demo data, rendered by the same code the product uses. If something here looks wrong, it is wrong in the product too.

1. The house fills in build order

Sequence, not slots. Each built day places the next part, so a missed day never leaves a hole — you simply carry on from where you stopped. The ridge is the 21st part, which is why finishing the sprint puts the top on your own house.

1 parts builtThe slab — day 1, work doneWall boards — not built yetWall boards — not built yetWall boards — not built yetWall boards — not built yetWall boards — not built yetWall boards — not built yetThe left post — not built yetThe right post — not built yetThe doorway — not built yetThe door — not built yetThe left window — not built yetThe right window — not built yetThe fascia — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe chimney — not built yetThe ridge — not built yet
1 part built
20 to the ridge
7 parts builtThe slab — day 1, work doneWall boards — day 4, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 7, work doneWall boards — not built yetWall boards — not built yetThe left post — day 2, work doneThe right post — day 3, work doneThe doorway — not built yetThe door — not built yetThe left window — not built yetThe right window — not built yetThe fascia — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe chimney — not built yetThe ridge — not built yet
7 parts built
14 to the ridge
14 parts builtThe slab — day 1, work doneWall boards — day 4, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 7, work doneWall boards — day 8, work doneWall boards — day 9, work doneThe left post — day 2, work doneThe right post — day 3, work doneThe doorway — day 10, work doneThe door — day 11, work doneThe left window — day 12, work doneThe right window — day 13, work doneThe fascia — day 14, work doneThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe chimney — not built yetThe ridge — not built yet
14 parts built
7 to the ridge
21 parts builtThe slab — day 1, work doneWall boards — day 4, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 7, work doneWall boards — day 8, work doneWall boards — day 9, work doneThe left post — day 2, work doneThe right post — day 3, work doneThe doorway — day 10, work doneThe door — day 11, work doneThe left window — day 12, work doneThe right window — day 13, work doneThe fascia — day 14, work doneThe roof — day 15, work doneThe roof — day 16, work doneThe roof — day 17, work doneThe roof — day 18, work doneThe roof — day 19, work doneThe chimney — day 20, work doneThe ridge — day 21, work done
21 parts built
The ridge lands. Complete.

2. The ghost, and what the states mean

The whole house is visible from day one as a faint ghost, so you can see what you are building before you have laid anything. A placed part is solid when the work happened and pale when it did not. Nothing is ever withheld or scolded: position and fill carry the whole meaning.

The ghostThe slab — not built yetWall boards — not built yetWall boards — not built yetWall boards — not built yetWall boards — not built yetWall boards — not built yetWall boards — not built yetThe left post — not built yetThe right post — not built yetThe doorway — not built yetThe door — not built yetThe left window — not built yetThe right window — not built yetThe fascia — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe chimney — not built yetThe ridge — not built yet
Day 0 — the ghost
Nothing built. The shape is already visible.
A real monthThe slab — day 1, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 8, work doneWall boards — day 9, work doneWall boards — day 10, work still owedWall boards — day 11, work doneThe left post — day 2, work doneThe right post — day 3, work still owedThe doorway — day 12, work doneThe door — day 15, work doneThe left window — day 16, work still owedThe right window — day 17, work doneThe fascia — day 18, work doneThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe chimney — not built yetThe ridge — not built yet
A real month
Gaps, a hollow part, a half day. Nobody runs perfect.
FinishedThe slab — day 1, work doneWall boards — day 4, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 7, work doneWall boards — day 8, work doneWall boards — day 9, work doneThe left post — day 2, work doneThe right post — day 3, work doneThe doorway — day 10, work doneThe door — day 11, work doneThe left window — day 12, work doneThe right window — day 13, work doneThe fascia — day 14, work doneThe roof — day 15, work doneThe roof — day 16, work doneThe roof — day 17, work doneThe roof — day 18, work doneThe roof — day 19, work doneThe chimney — day 20, work doneThe ridge — day 21, work done
Finished
21 built days. Days 22–30 earn props.

3. Paint, chosen at setup

One house definition, four palettes. Because the house is data rather than a picture, a colour choice is a palette swap and costs nothing. Brick, roof and door colours come later on the same mechanism.

cedarThe slab — day 1, work doneWall boards — day 4, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 7, work doneWall boards — day 8, work doneWall boards — day 9, work doneThe left post — day 2, work doneThe right post — day 3, work doneThe doorway — day 10, work doneThe door — day 11, work doneThe left window — day 12, work doneThe right window — day 13, work doneThe fascia — day 14, work doneThe roof — day 15, work doneThe roof — day 16, work doneThe roof — day 17, work doneThe roof — day 18, work doneThe roof — day 19, work doneThe chimney — day 20, work doneThe ridge — day 21, work done
cedar
skyThe slab — day 1, work doneWall boards — day 4, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 7, work doneWall boards — day 8, work doneWall boards — day 9, work doneThe left post — day 2, work doneThe right post — day 3, work doneThe doorway — day 10, work doneThe door — day 11, work doneThe left window — day 12, work doneThe right window — day 13, work doneThe fascia — day 14, work doneThe roof — day 15, work doneThe roof — day 16, work doneThe roof — day 17, work doneThe roof — day 18, work doneThe roof — day 19, work doneThe chimney — day 20, work doneThe ridge — day 21, work done
sky
roseThe slab — day 1, work doneWall boards — day 4, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 7, work doneWall boards — day 8, work doneWall boards — day 9, work doneThe left post — day 2, work doneThe right post — day 3, work doneThe doorway — day 10, work doneThe door — day 11, work doneThe left window — day 12, work doneThe right window — day 13, work doneThe fascia — day 14, work doneThe roof — day 15, work doneThe roof — day 16, work doneThe roof — day 17, work doneThe roof — day 18, work doneThe roof — day 19, work doneThe chimney — day 20, work doneThe ridge — day 21, work done
rose
mossThe slab — day 1, work doneWall boards — day 4, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 7, work doneWall boards — day 8, work doneWall boards — day 9, work doneThe left post — day 2, work doneThe right post — day 3, work doneThe doorway — day 10, work doneThe door — day 11, work doneThe left window — day 12, work doneThe right window — day 13, work doneThe fascia — day 14, work doneThe roof — day 15, work doneThe roof — day 16, work doneThe roof — day 17, work doneThe roof — day 18, work doneThe roof — day 19, work doneThe chimney — day 20, work doneThe ridge — day 21, work done
moss

4. The 21 parts, in order

The build order is fixed and the same for everyone. Every part is its own element, which is what makes hovering and tapping work without any hit-testing.

  1. 1The slab
  2. 2The left post
  3. 3The right post
  4. 4Wall boards
  5. 5Wall boards
  6. 6Wall boards
  7. 7Wall boards
  8. 8Wall boards
  9. 9Wall boards
  10. 10The doorway
  11. 11The door
  12. 12The left window
  13. 13The right window
  14. 14The fascia
  15. 15The roof
  16. 16The roof
  17. 17The roof
  18. 18The roof
  19. 19The roof
  20. 20The chimney
  21. 21The ridge

5. The street

Everyone's house in a row, each at whatever stage that person has reached. Mixed stages are the point rather than a compromise: six identical houses would look like a spreadsheet, and the ones further along show a newcomer what is coming. Empty plots stay visible, so the street reads as filling up.

YouThe slab — day 1, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 8, work doneWall boards — day 9, work doneWall boards — day 10, work still owedWall boards — day 11, work doneThe left post — day 2, work doneThe right post — day 3, work still owedThe doorway — day 12, work doneThe door — not built yetThe left window — not built yetThe right window — not built yetThe fascia — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe chimney — not built yetThe ridge — not built yetYoudone
AshaThe slab — day 1, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 7, work still owedWall boards — day 8, work doneWall boards — day 10, work doneWall boards — day 11, work doneThe left post — day 2, work doneThe right post — day 3, work doneThe doorway — day 12, work doneThe door — not built yetThe left window — not built yetThe right window — not built yetThe fascia — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe chimney — not built yetThe ridge — not built yetAsha 👁done
TomThe slab — day 1, work doneWall boards — day 4, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 8, work doneWall boards — day 9, work doneWall boards — day 11, work doneThe left post — day 2, work still owedThe right post — day 3, work doneThe doorway — day 12, work still owedThe door — not built yetThe left window — not built yetThe right window — not built yetThe fascia — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe chimney — not built yetThe ridge — not built yetTomlaid
PriyaThe slab — day 1, work doneWall boards — day 4, work doneWall boards — day 5, work still owedWall boards — day 6, work doneWall boards — day 7, work doneWall boards — day 9, work doneWall boards — day 10, work doneThe left post — day 2, work doneThe right post — day 3, work doneThe doorway — day 11, work doneThe door — day 12, work doneThe left window — not built yetThe right window — not built yetThe fascia — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe chimney — not built yetThe ridge — not built yetPriyadone
DanThe slab — day 2, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 7, work still owedWall boards — day 9, work doneWall boards — day 10, work doneWall boards — day 11, work still owedThe left post — day 3, work doneThe right post — day 4, work doneThe doorway — day 12, work doneThe door — not built yetThe left window — not built yetThe right window — not built yetThe fascia — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe chimney — not built yetThe ridge — not built yetDandone
MeiThe slab — day 1, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 7, work doneWall boards — day 8, work doneWall boards — day 9, work doneWall boards — day 10, work still owedThe left post — day 2, work doneThe right post — day 4, work doneThe doorway — day 11, work doneThe door — not built yetThe left window — not built yetThe right window — not built yetThe fascia — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe chimney — not built yetThe ridge — not built yetMeihalf
empty plot
empty plot
empty plot
empty plot
empty plot
empty plot

The eye marks someone who has asked for eyes on their day. That is the only thing that earns attention here, because rewarding comment volume produces praise spam.

6. The honest strip

The house always moves forward, so it cannot show which days were missed. The strip does. Filled is posted and done, outlined-grey is posted only, empty is quiet. The house is the reward, the strip is the record.

14 parts built · 11 solid · 3 hollow · 7 to the ridge

7. The stream

One entry per brick, carrying both of that day's videos. Every entry is a brick or a comment on a brick, and there is deliberately no way to post an unanchored message: that is the difference between this and a group chat nobody can keep up with.

Mei · day 12

60s + 30s

Four case studies in. Morning post only today, evening ran over. Tomorrow: the last two.

Asha · day 12

60s + 30s

Episode 3 recorded, one take. Eyes on this: the intro is 90 seconds, does it drag

Dan First 20 seconds are the episode. Cut to the question.

A “new since you last looked” divider marks unread position inside the stream. There is no badge or count anywhere in the product, because a number you can drive to zero invites checking.

8. Your own house, mid-sprint

What a member actually sees on day 12. Tapping any part jumps to that day's entry in the stream, which is how a house doubles as an index of the month.

Your house so farThe slab — day 1, work doneWall boards — day 5, work doneWall boards — day 6, work doneWall boards — day 8, work doneWall boards — day 9, work doneWall boards — day 10, work still owedWall boards — day 11, work doneThe left post — day 2, work doneThe right post — day 3, work still owedThe doorway — day 12, work doneThe door — not built yetThe left window — not built yetThe right window — not built yetThe fascia — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe roof — not built yetThe chimney — not built yetThe ridge — not built yet

Day 12 · 10 built · 8 solid · 2 hollow

Deferred by decision, not by oversight: props for days 22–30, the life forms unlocked by responding to a neighbour, Memory Lane for finished houses, and the shrouded map from the suburbs to the city.